Accessibility Links

Agent (SCL)

  • Salary: Up to £60000.00 per annum
  • Location: City of London, London
  • Job type: Permanent
  • Sector: Civil Engineering/Infrastructure
  • Job reference: BBBH377404_1524838971

Job description

Purpose of the job

The SCL Tunnel Agent is responsible for planning and supervising works at the site within their delivery scope, ensuring all works are planned and carried out safely, to the required standards and are delivered to time and budget.

Accountabilities / Key responsibilities

  • Manages all SCL tunnel works on site. Ensure works on site are carried out safely with due regard to the protection of the workforce, public and the environment.
  • Report all construction issues to the Tunnel Manager.
  • Manages a team of Sub-Agents and Engineers and
  • Ensure all works are constructed efficiently, to the required quality and in accordance with the required contract programme.
  • Ensure that all certificate, assurance and compliance certificates are generated and collated.
  • Ensure that CDM regulations are complied with and in particular the CDM Health and Safety file is compiled.
  • Produce 3 weeks and 2 months look ahead detailed programmes. Attends the weekly workplan meeting and regularly reports production progress. Assist the Tunnel Manager and Project Controls Manager to update the tunnel program. Identifies potential program risks and reports them to the tunnel manager.
  • Prepare and review Method Statements and ITPs. Coordinate materials approval process.
  • Produce Weekly reports on site progress. Ensure the daily logs are produced and contain all the relevant information about the works carried out.
  • Manage effective use of materials and control of waste.
  • Responsible for managing the SCL construction teams.
  • In absence of the Tunnel Sub Agent, attends RESS meetings, agrees RESS and delivers RESS briefing
  • Ensures that all procedures and documents (RA-MS, Excavation Sequence, RESS reports, ITP, MIP, Q&A etc) are in place for the safe and efficient running of the tunnel works.
  • Ensures NCRs are raised by the production team when defects are identified.
  • Be available and liaises with Senior Engineer when an Emergency RES meeting is called.
  • Prepares with the logistics manager the daily logistics cycle to efficiently operate the site.
  • Ensures that requisitions are prepared and submitted in advance of the works and are delivered in timely manner. Supports the Tunnel Manager and The Procurement Manager to produce the procurement scopes for all tunnel subcontracts.
  • Provides information about the costs incurred (plant, labour and materials) and assist the Commercial manager to prepare costs estimates.
  • Ensures the works are carried out in accordance with the IFC drawings. Ensures that all temporary works are carried out as per the IFC drawings.
  • Assist the tunnel manager to periodically carry out H&S inspections.

Job-Specific Safety Responsibilities

Ensure the tunnel site is established in a professional and safe manner.

Ensure that the Safe System of Work is followed and kept up to date for all SCL activities.

Ensure a programme of tool box talks and method statement briefings is implemented for all operations under their control.

Ensure that subcontractors conduct their activities in a safe manner and comply with safety rules and procedures.

Encourage operatives to report any near misses, hazards observed and any defects in plant or equipment.

Anderselite Ltd operates as both an Employment Agency and Employment Business.
Our non-discrimination policy can be viewed on our website at anderselite .com /non-discrimination-policy

Anderselite Buzz